← Back to Architects

Neckarbaudirektion

7 projects in the database · published 1928–1930
ProjectLocationYearPublicationLinks
Double lock of the Ladenburg barrage Ladenburg 1928
Wasmuths Monatshefte 1928 / 01, p. 1
Weir, Heidelberg Heidelberg 1928
Wasmuths Monatshefte 1928 / 01, p. 5
also in Die Form 1930 / 10, p. 5
Neckar bridge, Heidelberg Heidelberg 1928
Wasmuths Monatshefte 1928 / 01, p. 7
Neckar Lock at Mannheim Mannheim 1930
Die Form 1930 / 10, p. 3
Oberesslingen Weir and Power Station Oberesslingen 1930
Die Form 1930 / 10, p. 9
Horkheim Weir and Power Station Horkheim 1930
Die Form 1930 / 10, p. 10
Design for the Heilbronn Dam Stage Heilbronn 1930
Die Form 1930 / 10, p. 11